Rhein-Neckar-Arena Sinsheim: Schäfer is building for the club on the way up!

The surprise title contenders, TSG Hoffenheim, completed their new stadium in just two years. A modern arena for more than 30,000 spectators was built for 60 million Euros on a green-field site near the A6 motorway. On 25th May 2007 the first turf was ceremonially dug for the building of the new football stadium. TSG 1899 Hoffenheim's new home was opened on the 24th of January 2009 with the league leaders enjoying a 6:2 victory against a team selection from the Rhine-Neckar-conurbation. Schäfer fitted out all the stadium areas with WC partition wall systems. A total of more than 350 cubicles were used, which were fitted in only 4 weeks. In the VIP areas sanitary cubicles type SVFG40 were used, and the areas for the fans were fitted with the VK13 sanitary cubicle system.

Client: DH Besitzgesellschaft mbH & Co. KG
Project management: AGN, Ibbenbüren www.agn.de

Schäfer today

VENTO: Luxury room-high
toilet partition made of glass

<strong>VENTO:</strong> Luxury room-high<br>toilet partition made of glass VIEW PRODUCT

Kö-Bogen: Impressive outside, indside and in the sanitary area.

<strong>Kö-Bogen:</strong> Impressive outside, indside and in the sanitary area. VIEW REFERENCE

Look&Wave smart
Contact free opening
and closing

Look&Wave smart Contact free opening and closing MORE INFORMATION

Room-high cubicles:
Maximum privacy

Room-high cubicles: Maximum privacy VIEW PRODUCTS
Weiter Weiter

What can we do for you?

Schäfer Trennwandsysteme GmbH, Industriepark 37, Postfach 60, D-56593 Horhausen, info@schaefer-tws.de

Arrange a counseling interview.


loading
Sent.

Write us.


loading
Sent.

Telephone: +49 (0) 2687 9151-0
Telefax: +49 (0) 2687 9151-30

Schäfer Trennwandsysteme GmbH
Industriepark 37
D-56593 Horhausen

Postal address:
Postfach 60
D-56593 Horhausen

Contact

Send a message ›

Send a message

Schäfer product world ›

Schäfer product world