Refurbishment of HSBC headquartes in Hong Kong.

The Hong Kong and Shanghai Banking Corporation has completely refurbished the toilet and washroom areas of its headquarters in Hong Kong. The building, completed in 1985 by Lord Norman Foster, is still one of the high points of the Hong Kong skyline, even today. When it was completed, it was the most expensive building in the world, and was awarded numerous design prizes. Schäfer Trennwandsysteme supplied 170 sanitary cubicles type SVF30 JUMP; their minimalist design fits perfectly into the overall design of the new washrooms.

Schäfer today

BRAND NEW!
Colourful designs for kindergarten toilet partitions!

<strong>BRAND NEW!</strong> Colourful designs for kindergarten toilet partitions! VIEW KIGA DESIGNS

Door handle SLIDESAFE
Lock and unlock the toilet door very easy!

<strong>Door handle SLIDESAFE</strong> Lock and unlock the toilet door very easy! VIEW SLIDESAFE

Touch-free toilet doors
Permanent hygiene in the sanitary room

<strong>Touch-free toilet doors</strong> Permanent hygiene in the sanitary room MORE INFORMATION

Sanitary partition wall SVFG40
A modern sanitary partition wall makes the difference!

<strong>Sanitary partition wall SVFG40</strong> A modern sanitary partition wall makes the difference! VIEW SVFG40
Weiter Weiter

What can we do for you?

Schäfer Trennwandsysteme GmbH, Industriepark 37, Postfach 60, D-56593 Horhausen, info@schaefer-tws.de

Arrange a counseling interview.



loading
Sent.

Write us.


loading
Sent.

Telephone: +49 (0) 2687 9151-0
Telefax: +49 (0) 2687 9151-30

Schäfer Trennwandsysteme GmbH
Industriepark 37
D-56593 Horhausen

Postal address:
Postfach 60
D-56593 Horhausen

Contact

Send a message ›

Send a message